Various soil disorders, which posed safety and structural difficulties at the two Promenade and Nicoll Freeway MRT stations. Distinctive tactics had been used to tunnel in these parts as well as under the Kallang Basin. Within the Mountbatten location, really hard floor designed it further difficult to extract some five hundred bolstered concrete a